​Unit 306 Self study
Part 5
Risk assessment and method statements

media

2

​Click on the following link to open the text:

Unit 306 P6 Risk assessment & Method statements.pdf


then use the text to answer the questions that follow.

3

Multiple Choice

What is a risk assessment intended to provide?

1

Financial forecasts

2

Information to keep workers safe

3

Marketing insights

4

Employee performance reviews

4

Multiple Choice

What is the first step in the risk assessment process according to the HSE document?

1

Identify the hazards.

2

Decide who might be harmed and how.

3

Evaluate the risks and decide on precautions.

4

Record your findings and implement them.

5

Multiple Choice

Why is it important to identify who might be harmed in a risk assessment?

1

To ensure compliance with legal requirements.

2

To help identify the best way to manage the risk.

3

To reduce the cost of safety measures.

4

To avoid unnecessary paperwork.

6

Multiple Choice

What should be done if chlorination of a cold water storage cistern is carried out at the same time as other work?

1

Refer to COSHH data sheets for the chemicals.

2

Ignore the other work.

3

Stop the chlorination process.

4

Consult with a supervisor.

7

Multiple Choice

What is the purpose of a risk assessment according to the text?

1

To identify potential hazards and decide on precautions

2

To ensure all employees are wearing uniforms

3

To increase company profits

4

To reduce the number of employees

8

Multiple Choice

What is one method mentioned for reducing risks in a work area?

1

Using barriers around a work area

2

Increasing the number of employees

3

Reducing the work hours

4

Eliminating all safety equipment

9

Multiple Choice

What should be done with the results of a risk assessment?

1

Write them down and share with the team

2

Ignore them if there are fewer than ten employees

3

Keep them confidential

4

Only share with upper management

10

Multiple Choice

What is a potential risk when working with existing pipework?

1

The presence of asbestos

2

The need for more employees

3

The increase in water pressure

4

The decrease in temperature

11

Multiple Choice

What is a risk calculation formula used for?

1

To determine the cost of a project

2

To assign a number to each risk

3

To calculate the time needed for a task

4

To evaluate the quality of materials

12

Multiple Choice

What does a quantitative approach involve in risk assessment?

1

Estimating the cost of materials

2

Ranking risks with a number

3

Evaluating the skills of workers

4

Scheduling maintenance tasks

13

Multiple Choice

According to the risk calculation table, what is the consequence of a 'certainty' likelihood?

1

No injury or loss

2

Treated by first aid

3

Specified major injury

4

Fatality

14

Multiple Choice

What action is recommended for a calculated risk figure between 8 and 15?

1

Minor, but monitor closely

2

Significant, immediate control action

3

Critical, all activities must stop

4

No action needed

15

Multiple Choice

What is the risk factor for accessing loft space with a ladder according to the document?

1

6

2

8

3

10

4

12

16

Multiple Choice

Which of the following is a control measure for using a ladder to access loft space?

1

Use a wooden ladder

2

Ensure ladder extends sufficiently into loft space

3

Use a ladder without inspection

4

Avoid using PPE

17

Multiple Choice

What is the likelihood of an accident from a fall or slip on a freestanding portable ladder?

1

1

2

2

3

3

4

4

18

Multiple Choice

What is one of the hazards mentioned for accessing loft space with a ladder?

1

Electrical shock

2

Slipping and falling

3

Fire hazard

4

Chemical exposure

19

Multiple Choice

What is the qualitative method in risk assessment?

1

It uses numerical values to assess risk.

2

It divides risks into categories such as low, medium, and high.

3

It eliminates all risks completely.

4

It focuses only on financial risks.

20

Multiple Choice

In the risk assessment form, what is the existing measure to control the risk of gas leakage?

1

Use of fire extinguishers.

2

System tested before use.

3

Installation of smoke detectors.

4

Regular fire drills.

21

Multiple Choice

What action is required if purging of gas leads to a risk of gas in air/LEL lower explosive limit?

1

No action required.

2

Immediate evacuation.

3

No naked flames or switching unless intrinsically safe (IS).

4

Increase ventilation.

22

Multiple Choice

Who is responsible for using a gas co seeker to search leaks plus leak detection fluid?

1

Supervisor/Foreman.

2

Senior gas engineer/Plumber.

3

Junior apprentice.

4

Safety officer.

23

Multiple Choice

General Risk Assessment Form for gas work in a boiler room.

1

Risk Assessment for electrical work in a boiler room.

2

General Safety Checklist for kitchen appliances.

3

Fire Safety Assessment for office spaces.

4

General Risk Assessment Form for gas work in a boiler room.

24

Multiple Choice

What is the purpose of a method statement in a high-risk situation?

1

To provide a general overview of the work

2

To prevent accidents or dangerous situations from occurring

3

To list all possible hazards without solutions

4

To replace the need for risk assessments

25

Multiple Choice

According to the risk rating calculation, what is the risk level if the likelihood is 1 and the severity is 1?

1

Low

2

Medium

3

High

4

Critical

26

Multiple Choice

What should a method statement include to be considered suitable?

1

Only a list of potential hazards

2

Drawings, plans, specifications, and risk assessments

3

A brief summary of the work

4

Only the names of the workers involved

27

Multiple Choice

What is the main purpose of a method statement according to the key term definition?

1

To provide a checklist for workers

2

To guide site work and prevent accidents

3

To replace safety training

4

To document employee attendance

28

Multiple Choice

What is the purpose of providing a method statement when installing a septic tank?

1

To ensure the job is completed quickly

2

To protect workers and the public

3

To reduce the cost of installation

4

To avoid using specialist contractors

29

Multiple Choice

Which of the following is included in the details of a method statement?

1

The color of the equipment

2

The weather forecast

3

The scope of the work

4

The personal preferences of the workers

30

Multiple Choice

What should a method statement include regarding equipment?

1

The brand of the equipment

2

Lifting, drilling, and excavation equipment

3

The cost of the equipment

4

The color of the equipment

31

Multiple Choice

What is the role of management in the context of a method statement?

1

To ignore the method statement

2

To ensure the working methods are followed

3

To change the method statement frequently

4

To reduce the number of team meetings

pattern-tertiary

​Unit 306 Self study
Part 5
Risk assessment and method statements