Types of Claims
Presentation
•
Professional Development
•
Professional Development
•
Medium
Ricardo Makayan
Used 8+ times
FREE Resource
11 Slides • 7 Questions
1
Types of Claims
Changes interrupt the flow of work, create delays, create schedule slips and inflate construction costs which in turn might generate claims and possibility even costly litigation.

2
Multiple Select
Changes in design that require changes in execution methodology that may increase cost and extend contract completion. Who can Claim?
Contractor
Client
3
Scope Change
Are Changes in the work required by the contract but within the physical limits and general scope of the work
4
Multiple Select
Defective workmanship when the contractor does not meet the quality standards set in the contract drawings and specs. Who can Claim?
Contactor
Client
5
Defective Work and Damages
The Project owner may file a claim for disputes resulting from defective workmanship when the contractor does not meet the quality standards set in the contract drawings and specs
6
Multiple Select
Failed to comply with the requirement on materials. Who can claim?
Contractor
Client
7
Materials Not of Specifications
A situation wherein contractor failed to comply with the requirement on materials based from contract specification
8
Multiple Select
An unlimited mistakes in contract drawings, specification or other data furnished by the project owner or his authorized representative.
Who can Claim?
Contractor
Client
9
Errors and Omissions
An unlimited mistakes in contract drawings, specification or other data furnished by the project owner or his authorized representative.
10
Multiple Select
Notification by the project owner or his authorized representative to suspend all or a portion of the work operation. Who Can Claim?
Contractor
Client
11
Suspension of Work and Work Stoppage
Notification by the project owner or his authorized representative to suspend all or a portion of the work operation entitles the contractor the right to claim for a time extension and actual cost incurred as a result of unreasonable delays.
12
Multiple Select
Lack of Right of Way, delay by the project owner in final purchase or acquisition of the site, incomplete demolition by other contractors, etc. Who can Claim?
Contractor
Client
13
Access or Availability of Site
A potential claim that may result when a contractor is denied free access to all or a portion of the site because of physical conditions that prohibit him from proceeding with contract work
14
Excusable Delays
Entitles a contractor to a time extension which arises because of:
1. Project Owner initiated changes
2. Severe weather and other force majeure considerations
3. Design Problems
15
Inexcusable Delays
Caused by events which should have been reasonably expected or generally of the contractor own making
16
Compensable Delays
Entitles the contractor to both extension of time and additional compensation
Ex. Scope changes, late delivery of project owner’s supplied materials, late delivery of information, impeded site access, out of sequence of work requested by the project owner.
17
END
18
Multiple Select
Defective workmanship when contractor does not meet the quality standards set in the contract drawings and specs
Contactor
Client
Types of Claims
Changes interrupt the flow of work, create delays, create schedule slips and inflate construction costs which in turn might generate claims and possibility even costly litigation.

Show answer
Auto Play
Slide 1 / 18
SLIDE
Similar Resources on Wayground
10 questions
Groups vs Teams
Presentation
•
Professional Development
13 questions
LCO Quiz Whizz S2 Ep.7
Presentation
•
Professional Development
13 questions
Trade Waste
Presentation
•
Professional Development
14 questions
Electron Math
Presentation
•
9th - 12th Grade
11 questions
The Story: REFRESHER
Presentation
•
Professional Development
13 questions
Progress review of personal goals
Presentation
•
Professional Development
15 questions
Amplified Service 2021
Presentation
•
Professional Development
13 questions
Leadership Development Hiring Guide
Presentation
•
Professional Development
Popular Resources on Wayground
24 questions
PBIS-HGMS Day 10
Quiz
•
6th - 8th Grade
10 questions
HCS SCI 03 Summer School Review 3
Quiz
•
3rd Grade
11 questions
Home Scope
Quiz
•
7th - 8th Grade
15 questions
HCS SCI 05 Summer School Assessment 3 Review
Quiz
•
5th Grade
35 questions
Lufkin Road Middle School Student Handbook & Policies Assessment
Quiz
•
7th Grade
18 questions
Geo 11.3 Area of Circles and Sectors
Quiz
•
9th - 11th Grade