
EM GROUP 4
Authored by Kristine Brucal
Engineering
University
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
They manufacture products in small lots that are needed by, but cannot be produced economically by many companies
Job Shop
Batch Flow
Work Paced Assembly Line
Machine Paced Assembly Line
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
This method of processing is a combination of the batch and the continuous flow
Job Shop
Batch Flow
Work Paced Assembly Line
Batch/Continuous Flow Hybrid
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Organizations are designed mainly to produce products or services.
True
False
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A service factory offers unlimited mix of services which results to some economies of scale in operations.
True
False
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The layout used are those for job shops or fixed position
Mass Service
Service Shop
Professional Services
Service Factory
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Production Planning is the phase of production control involved in developing timetables
True
False
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Quality Control refers to the measurement of products or services against standards set by the company.
True
False
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Microsoft
or continue with
%20(1).png)
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?