Search Header Logo

6035 | Communications LO2

Authored by George Harding

Professional Development

Professional Development

Used 60+ times

6035 | Communications LO2
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

STATEMENT: Manufacturers’ instructions must be followed at all times, even if they contradict the regulations and BS.

TRUE

FALSE

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select all important legislations relating to running a successful business.

Data Protection Act

Manufacturer's Certification

Freedom of Information Act

Equal Opportunity

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct description for: Timesheet

Completed on a weekly basis, containing details of hours worked, description of work carried out, and at which site.

Details needed by the contractor to enable them to carry out the work.

A description of the installation being quoted for, containing the materials and appliances.

The progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing.

4.

DRAG AND DROP QUESTION

1 min • 1 pt

British Standards ​are ​ (a)   primary source of information when installing appliances. They can be overridden by ​ the (b)   ​.

not a
manufacturer's instructions
always the
sometimes the
BS institute
Codes of practice

5.

DRAG AND DROP QUESTION

1 min • 1 pt

Match the correct Building Regulations.

Part A: ​ (a)   . Part P: ​ (b)   . Part G: ​ (c)  

Part H:​ (d)   . Part L: ​ (e)  

Structure
Electrical safety
Sanitation
Drainage and waste disposal
Conservation of fuel and power

6.

DRAG AND DROP QUESTION

1 min • 1 pt

The conservation of fuel and power is categorised as:

Part L1a: ​ (a)   Part L2b: ​ (b)  

Part L1b: ​​ (c)   Part L2a: ​ (d)  

New dwellings
New buildings other than dwellings
Existing dwellings
Existing buildings other than dwellings

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct description for: Work drawing

Completed on a weekly basis, containing details of hours worked, description of work carried out, and at which site.

Details needed by the contractor to enable them to carry out the work.

A description of the installation being quoted for, containing the materials and appliances.

The progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?