
Construction Equipment Exam
Authored by jake wellander
Professional Development
University
Used 12+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For loading and unloading equipment, a trailer should be parked _____.
with the towing vehicle uphill
on level ground
with the towing vehicle downhill
and unhitched from the towing vehicle
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Before disconnecting hydraulic lines, _____.
get approval from your supervisor
turn off the equipment
take a pressure reading
relieve system pressure
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To prevent sparks that could ignite fuel, _____.
always wear rubber-soled shoes
wipe the fuel nozzle with an antistatic cloth
ground the fuel nozzle or funnel
use a low fuel-flow rate
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Never connect a battery charger to an outlet with an extension cord longer than _____.
10 feet
15 feet
20 feet
25 feet
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If a problem with an aerial lift is found while performing daily checks, _____.
note the problem and continue working
contact the manufacturer immediately
disconnect the battery and continue with the daily checks
correct the problem before beginning work
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The worker using the platform controls on an aerial lift is designated as the _____.
controller
operator
driver
conductor
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A drive control that returns to neutral and locks when released is referred to as a(n) _____.
emergency cutout
safety interlock
deadman switch
termination device
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Microsoft
or continue with
%20(1).png)
Apple
Others
Already have an account?