Chapter 9: Footings & Foundations - Know and Understand

Authored by AJ Adame

Design

12th Grade

Used 3+ times

Chapter 9: Footings & Foundations - Know and Understand
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Grading may be needed before building lines are laid out.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is best to locate building lines with a builder’s level, transit, or _____.

autolevel

laser level

theodolite

total station

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A residence may need as much as 8′ to _____ of clearance for batter boards.

10

4

3

15

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Building sites on steep slopes or rugged terrain should be rough-graded before the building is laid out.

true

false

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The highest point on the perimeter of an excavation is known as the _____.

grade level

control point

grade point

building line

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt


  1. IRC now allows frost-protected shallow foundations that are only _____″ below grade.

6

12

16

36

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A _____ footing is one that changes grade levels at intervals to accommodate a sloping lot.

spread

plain

reinforced

stepped

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?