1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

STATEMENT: The hot water distribution should be level from the cylinder and should be at least 450mm long before the vent pipe connection.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

STATEMENT: A solid fuel boiler has an easier temperature control than those of gas and electric.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Where would you find the component shown here?

F&E cistern

Inlet to combi boiler

Primary return pipe

CWSC open vent

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following are safety measures to prevent water exceeding 100°C?

Expansion vessel

Cylinder thermostat

PRV/TPRV

All of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which pipe connects from the CWSC to the hot water cylinder?

Cold feed

Cold distribution

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a type of fuel source?

Natural gas

LPG

Solid fuel

All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During soundness test A, what pressure is the pipework tested at for 15 minutes?

The exact working pressure

1/3 of working pressure

1.5 times the working pressure

4 times the working pressure

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?