1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

House Load dapat dilakukan jika

CB 52G Open

DS 41E Open

CB 52L1 Open

CB 52L1L2 Open

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pada saat Unit beroperasi normal, Berapa jumlah HRSG FWP yang beroperasi?

1 FWP

2 FWP

3 FWP

Redundant

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pada Normal Operasi, Berapa Jumlah CEP yang inservice?

Hanya 1 CEP

2 CEP bekerja bersamaan

Tidak beroperasi

Disupport HRSG FWP

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Salah satu penyebab 2 buah HRSG FWP inservice adalah

2 CEP Inservice

Load Naik

Duct Burner Inservice

Steam Drain Valve Open

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Salah satu penyebab fenomena Swelling di steam drum adalah ?

Kenaikan Level steam drum

unit Load Turun

Unit Load Naik Cepat

House Load

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Kapan Fenomena swelling dan shringking dapat terjadi

Runback

Unit start up

Load rejection

Part load

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Swelling dan shrinking dapat diatasi dengan mengontrol Level di drum dengan cara

1 Element control

3 element control

2 element control

Control level

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?