Search Header Logo

DxI600/800

Authored by mohd fazli ismail

Professional Development

Professional Development

Used 138+ times

DxI600/800
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following cannot be added/changed during a run on DxI?

Reaction Vessels (RVs)

Substrate

Wash Buffer

All can be changed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long must the substrate be at room temperature before loading on the system?

at least 6 hours

at least 12 hours

at least 8 hours

at least 18 hours

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is good practice to open the substrate load door to determine if there is adequate substrate on board.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

System Check will evaluate whether there is adequate particle mixing in the reagent pack.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When loading substrate on the DxI, you must initiate a prime through the Diagnostics screen.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The duckbill must be replaced every _________ tests.

500

1000

5000

10000

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

DxI detection technology?

Radioimmunoassay

ELISA

Chemiluminescence

ElectroChemiluminescence

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?