Search Header Logo

Setting Out for Basic Masonry Structures

Authored by Paul Heald

Other

1st Grade

Used 209+ times

Setting Out for Basic Masonry Structures
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A datum peg is used on site to;

Mark out walls
Set out roads
Set out roof trusses
Take all levels from

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

2 pegs are too far apart by 300mm to be checked for level using a spirit level. What would you use with the spirit level to span the pegs?

Spandrel
Builders line
Straight Edge
Sky Hooks

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What type of hammer would you use for knocking in the wooden pegs when marking out a site?

Lump hammer
Claw Hammer
Pin hammer
Sledge hammer

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

If broken bond is to be used it should be placed:

At the corner
Below an opening
Anywhere in the wall
Where the layer of bricks meet

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A convenient height for a site datum is;

Foundation height
Lintel height
Roof height
Finished floor level

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When transferring levels from a datum point to a building, the following equipment should be used;

Profile board & traveller
Site square
Line & pins
Straight edge & level

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A level used on site that works shooting a red dot onto a staff is a;

Dumpy level
Water level
Laser level
Theodolite

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?