L3 YR1 Unit 301 (Group task 2 Part 2) create a Method statement
Presentation
•
Other
•
Professional Development
•
Hard
Plumbers Cymoedd
Used 6+ times
FREE Resource
2 Slides • 0 Questions
1
You are to create a method statement for the installation of a first floor bathroom in a domestic house.
The job entails the removal of the existing bathroom comprising of a bath, wash hand basin and W.C, and all related hot and cold pipework and waste pipework. The existing hot and cold pipework is copper and the waste pipework is lead. The existing pipework is installed below the floorboards and must be renewed from where it enters the room, the waste pipework is installed again under the floorboards and exits the building through the outside wall where it is connected to an external soil and vent pipe. You are to re-install the pipework (Materials of your choice) and new appliances (Bath, wash hand basin & W.C.)
2
Your method statement can be in any format of your choosing i.e. A word document, Excel or from a template you have found online, however if an online template is used you must reference the source.
You are to create a method statement for the installation of a first floor bathroom in a domestic house.
The job entails the removal of the existing bathroom comprising of a bath, wash hand basin and W.C, and all related hot and cold pipework and waste pipework. The existing hot and cold pipework is copper and the waste pipework is lead. The existing pipework is installed below the floorboards and must be renewed from where it enters the room, the waste pipework is installed again under the floorboards and exits the building through the outside wall where it is connected to an external soil and vent pipe. You are to re-install the pipework (Materials of your choice) and new appliances (Bath, wash hand basin & W.C.)
Show answer
Auto Play
Slide 1 / 2
SLIDE
Similar Resources on Wayground
2 questions
L3 YR1 Unit 301 (Group task 1 pt3) Making a risk assessment
Presentation
•
Professional Development
2 questions
Journey Map Your Week
Presentation
•
Professional Development
1 questions
Grattitude Moments
Presentation
•
Professional Development
3 questions
FAMILY
Presentation
•
Professional Development
3 questions
حصص ريادة - math
Presentation
•
KG
3 questions
grr
Presentation
•
Professional Development
1 questions
Art Perception (Musical Periods) Last
Presentation
•
University
1 questions
untitled
Presentation
•
KG - University
Popular Resources on Wayground
10 questions
Safety Day 2026 – Student Review
Quiz
•
9th Grade
21 questions
Continents and Oceans
Quiz
•
6th Grade
20 questions
Parts of Speech
Quiz
•
5th Grade
16 questions
Subject & Predicate
Quiz
•
5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
12 questions
Map Skills
Quiz
•
3rd Grade
22 questions
Continents and Oceans
Quiz
•
5th Grade
15 questions
Rounding Decimals
Quiz
•
5th Grade